Risk Register Template for Accounting Practices
Record practice risks, controls and treatment actions using your own assessment criteria.
Use generic risk descriptions and role titles. Entries stay in this page and clear when you leave. Download a copy before closing.
Start your register
Enter your criteria and first risk, or load the fictional example.
Your entered risks will appear here.
Describe the Actual Practice Risk
This risk register template records your practice’s risks alongside controls, assessments and treatment actions. Enter your own criteria, then add each risk. Entries update locally as you type. Use role names and fictional or general descriptions, without client details.
Separate the cause from the event and its consequence. Manual recipient selection is a cause. Sending confidential documents to an unintended recipient is the event. Disclosure of client information is the consequence.
For a capacity risk, the cause could be overlapping deadlines and staff absence. The event is work exceeding available reviewer capacity. The consequence is delayed completion. For continuity, an untested restore procedure could leave files inaccessible after a system failure and interrupt client work.
Describe inherent risk before the controls you are assessing. Record residual risk after considering those controls and their evidence. Entering a control does not automatically reduce a rating. The practice makes each judgement.
Apply the Practice’s Assessment Criteria
Enter each likelihood and consequence level on its own line, with a colon between its label and definition. Include a period or context in likelihood definitions. Enter every matrix pair as likelihood | consequence | rating. Assessment fields must use the entered labels exactly.
The template looks up the pair in your matrix. It does not multiply ordinal categories or supply a universal scale. A missing pair or duplicate pair leaves the affected assessment unresolved. Your entered descriptions remain in the register.
Load example uses fictional confidentiality criteria. Likely and Major gives Urgent before controls. Unlikely and Major gives Monitor after controls. Those labels illustrate the lookup only. They do not recommend accepting a confidentiality risk or establish a professional duty.
Record existing controls separately from the next treatment action. Assign a treatment owner, due date and review record. A missing owner remains visible even when an assessment has a rating. Changing an assessment retains its earlier entered facts in the download’s assessment history.
Review Actions and Changes
Use the action filter to review open, overdue or completed treatments. A due date becomes overdue on the following local calendar day. Completing an action does not establish that its control works or that the practice has accepted the remaining risk.
Download register saves an editable JSON file containing every risk, entered criteria, assessment history and unresolved fields. The download includes all records regardless of the current filter. Keep that file in your approved practice records. This page cannot reopen a saved file.
Clear entries clears the page. Leaving it clears entries too, so download before navigating away. Loading the fictional example requires empty risk records to protect your entered work.
This business risk management tool records practitioner judgement. The wider risk management framework sets governance, assessment criteria, review arrangements and authority to accept risk. Business.gov.au’s risk management plan guidance covers identifying risks, assigning treatment responsibility and reviewing actions.
At each review, check whether the cause or exposure has changed, whether the recorded controls operate and whether overdue actions need reassignment. Record the decision and its reasons before changing the residual assessment.